Edinburgh

EPD worked with a cutting edge consulting team to develop the design of this unique facility. Situated in an existing dock and with a design brief for a fully covered whitewater course, a number of exceptional engineering solutions were examined and then the foremost drawn up and costed out for the client.

Working around planning issues, scheduled ancient monuments, fluctuating water levels, requirements for storm water capacity, poor ground conditions and difficult access were all issues that were considered within the design process.